State of Tennessee Electrical Wiring Permits:

 
     
Wiring Permits can be obtained at the Erwin Utilities Office. 
Inspection Fee Schedule:  
Temporary Service 61-200 amp

$27.00

Rough-In  

$27.00

Final: 61-200 amp

$27.00

  201-400 amp

$40.00

Residential Heating & Cooling

$27.00

Service Change  

based on service size

Mobile Home  

$27.00

Reinspection, if necessary

$27.00

Permit Fee  

$  5.00

Electrical Inspections: 
Electrical service cannot be provided until an approved electrical inspection is made. Inspections are made by the State of Tennessee Deputy Inspector. It is the responsibility of the Customer to call the Deputy Inspector for inspection. 

Inspector: Gene Rutherford
Phone: (423) 926-6119


Payment Locations:

 
  Payment may either be mailed to P. O. Box 817 or paid at the Erwin Utilities office at 244 Love Street. A payment drop box with envelopes for checks or money orders only is provided for your convenience. 

Payment may also be made at: 
Bank of Tennessee 
1220 N. Main Street 
Erwin, TN 37650 
-or- 
Mountain Commerce Bank 
Erwin and Unicoi Branch Office


Meter Reading and Billing:

 
  Meters will be read by Erwin Utilities' personnel on approximate thirty (30) day cycles, and bills are rendered within five (5) days following the reading. Bills are due and payable upon receipt. Failure to receive a bill does not excuse customer from payment. Each route has a specific due date. Please check with an Erwin Utilities' clerk for your route and monthly due date. 


Budget Billing Plan:

 
  This plan is available upon request to all residential customers who have been receiving service at their present location for at least twelve (12) months. Requests for information may be made in person at the office, by phone, or by mail. This plan provides residential customers a method of paying their monthly electric bills based on the average of their last twelve-month's billing plus any adjustments for rate increases which have occurred during that twelve-month period.


Billing Due Date Adjustment:

Social Security customers whose due date falls at the end of the month may have their billing due date adjusted to the 5th of the month.


Bank Draft or EFT 

 
  Monthly payments may be made by Electronic Funds Transfer from a customer's checking or savings account. Customer's signature and a voided check are required.


MISCELLANEOUS SERVICE CHARGES

 
  Connection Charges:
$20.00

Deposits:
Electric:
A. $100.00 - Homeowners & Residents of Town Acres and Sunnycrest
B. $250.00 - Rental Property & Mobile Home Parks

Water:
$30.00 - All Locations 

Each residential customer shall pay a deposit. In lieu of a deposit, an approved letter of good credit from the previous supplier of electricity indicating a good payment record over the past twelve (12) months with no more than one (1) late payment will be accepted. A homeowner's deposit under A. above shall be refunded, without interest, if Customer has no more than one (1) late payment in the last twelve (12) months nor been disconnected for nonpayment.  A renter's deposit under A. and B. above shall be refunded, without interest, if Customer has no more than one (1)  late payment per year in the last twenty four (24) months nor been disconnected for nonpayment.  Upon termination of service, any retained deposit will be applied against unpaid bills of Customer, and if any balance remains after application of deposit, the balance shall be refunded, without interest, to Customer.  If Customer transfers service from current location to a new location, Customer's deposit is transferable to the new location provided all current charges are paid in full at the current location. 

Fees for Nonpayment:
Collection Trip $15.00 
Reconnect Regular Hours $25.00 
Reconnect After Hours $60.00 
 


RATE SCHEDULES

 
Electric   
  Residential:
Customer Charge $7.35 per month
Energy Charge 8.116¢ per kWh
General Power Rate:
(not to exceed 50 kW or 15,000 kWh per month) 
Customer Charge $15.76 per month
Energy Charge 9.011¢ per kWh

Main Line Extension - to be determined after survey

 

Water   
 
Customer Charge Inside $ 5.47 per month
Outside $ 8.21 per month
Water Charge Inside $   .86 per 1,000 gal.
Outside $ 1.29 per 1,000 gal.
   

 

Wastewater
Customer Charge Inside $ 3.45 per month
Outside $ 5.18 per month
User Charge  Inside $ 2.46 per 1,000 gal.
Outside $ 3.69 per 1,000 gal.

 

TAPPING FEES
 
Water
3/4" Meter Size Inside $    800.00
Outside $ 1,125.00
1" Meter Size  Inside $ 1,055.00
Outside $ 1,480.00

 

Wastewater 
Residential Inside $ 1,275.00
Outside $ 1,600.00
Commercial & Industrial
                               To be determined after application for service

Main Line Extension - to be determined after survey. 
 

A certificate of occupancy from the Town of Erwin Building Inspector is required for all new structures requiring Electric, Water and Wastewater services inside the city. 

 


Commercial Deposits
  Commercial deposits are based upon two (2) months estimated average bill. When service is disconnected for any reason, the deposit will be applied to the unpaid account balance. 


Special Lighting

 
  Security lights, parking lot lights, and flood lights will be installed at the customer's request. The monthly charge includes installation, normal maintenance and power. Monthly charge depends on the light size and whether a transformer or pole is needed just for the light. 


   
   

RESIDENTIAL TWO-STAGE SURGE PROTECTION

 
  STAGE 1
Meterbase Protection
Erwin Utilities offers meterbase surge suppression units at the cost of $3.50 per month with an agreement of an initial term of five (5) years. Billing will be monthly and will be added to the customer’s regular electric bill.

STAGE 2
In Home Protection
Home Guard Defender   $74.95 plus tax
Package Includes:
-One Eight Receptacle Plugstrip w/built-in Cable Protection
-Computer Grade Sine-Waving Tracking
-One Three Receptacle Unit, Sine-Wave Tracking
-One Single Outlet Unit
-One Single Outlet Unit w/built-in Telephone Protection
-One Three-Blade Receptacle Circuit Tester

Our technician will inspect for a ground rod at the time of installing the Meterbase Surge Suppressor unit. If a ground rod cannot be located Erwin Utilities will install one at the cost of $25.00, or you may contact an electrician for installation.